Baud Air

Energy Efficiency Services

Lic. BL00067843
Cal Cers: CC2005690
Cheers: CCN78632086
EPA: P5EF796BE3A9C481
N.B.I.: 1031507
Phone: 951-313-2603
  • Home
  • About
    • Equipment and Tools
    • Qualifications
  • First Steps
  • What to Expect
  • Instructions
    • CF1R Registration Instructions
    • Instructions for Installers
    • Sealing Instructions
  • Contact

Sealing Instructions

Correction Check List:

  1. Remove return grill, and seal return cavity completely. To serve as a plenum.
  2. Remove all supply registers and caulk between can and drywall. The gap between the metal duct and the drywall itself.
  3. Reinstall supply registers and caulk around outside edge.
  4. Inspect ducting and plenumsĀ in attic, seal and repair any and all leaks in ducts and all joints and connections.
  5. Seal seams between furnace and platform, furnace and evap., coil and evap., coil and supply plenum.

Contact Us!

© Baud Air Energy. All Rights Reserved.
A Premium WordPress Website by imFORZA